Triple

T27486279
Position Surface form Disambiguated ID Type / Status
Subject Chongqing Rail Transit Line 4 E693745 entity
Predicate instanceOf P0 FINISHED
Object Chongqing Rail Transit line C641 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Chongqing Rail Transit line
Context triple: [Chongqing Rail Transit Line 4, instanceOf, Chongqing Rail Transit line]
  • A. Nanjing Metro line
    A Nanjing Metro line is a distinct rapid transit route within the Nanjing urban rail network, defined by its specific corridor, stations, and operational services connecting different parts of the city.
  • B. Shanghai Metro station
    A Shanghai Metro station is a designated public transit facility within the Shanghai Metro network where passengers access, board, transfer between, and alight from metro trains.
  • C. Wuhan Metro station
    A Wuhan Metro station is a designated facility along the Wuhan urban rail transit network where passengers access, board, transfer between, and alight from metro trains.
  • D. Kaohsiung MRT station
    A Kaohsiung MRT station is a designated public transit facility within the Kaohsiung Mass Rapid Transit system where passengers access, board, transfer between, and alight from metro trains and related services.
  • E. subway line chosen
    A subway line is a fixed route within an urban rail transit system, consisting of a sequence of stations and tracks over which trains operate according to a scheduled service.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef5382b9648190be0b1ef2ad5d043c completed April 27, 2026, 12:16 p.m.
Created at: April 27, 2026, 1:02 p.m.