Triple
T27480222
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Morecambe Bay coastline |
E693578
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | estuarine shoreline |
C35443
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: estuarine shoreline Context triple: [Morecambe Bay coastline, instanceOf, estuarine shoreline]
-
A.
estuary
An estuary is a coastal water body where freshwater from rivers and streams mixes with saltwater from the ocean, creating a dynamic and nutrient-rich environment.
-
B.
freshwater tidal estuary
A freshwater tidal estuary is a low-lying river mouth region where freshwater flows are influenced by ocean tides, causing regular water-level and flow reversals without significant saltwater intrusion.
-
C.
public shoreline
A public shoreline is a coastal area legally accessible to all people for recreation, passage, and enjoyment, typically protected by regulations that prevent exclusive private ownership or obstruction.
-
D.
marine–terrestrial interface
chosen
The marine–terrestrial interface is the dynamic boundary zone where ocean and land environments meet and interact, characterized by overlapping physical, chemical, and biological processes.
-
E.
tidal inlet
A tidal inlet is a narrow coastal waterway that connects the open sea with bays, lagoons, or estuaries, allowing tidal waters to flow in and out.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef5381f2648190a2392d0fab833095 |
completed | April 27, 2026, 12:16 p.m. |
Created at: April 27, 2026, 12:59 p.m.