Triple

T27468851
Position Surface form Disambiguated ID Type / Status
Subject Bear Lake Road E693252 entity
Predicate trafficManagement P18246 FINISHED
Object shuttle bus service operates seasonally LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: shuttle bus service operates seasonally | Statement: [Bear Lake Road, trafficManagement, shuttle bus service operates seasonally]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: trafficManagement
Context triple: [Bear Lake Road, trafficManagement, shuttle bus service operates seasonally]
  • A. trafficManagementStrategy
    Indicates a method or plan used to control, organize, or optimize the flow of traffic within a transportation system.
  • B. trafficManagementGoal
    Indicates a goal or objective related to managing, regulating, or optimizing traffic flow and conditions.
  • C. traffics
    Indicates engaging in the buying, selling, or illicit trading of someone or something, typically as part of an ongoing commercial or criminal operation.
  • D. hasTrafficManagement chosen
    Indicates that an entity implements, uses, or is associated with systems or measures for controlling and optimizing traffic flow.
  • E. routesTrafficThrough
    Indicates that network traffic originating from one entity is directed to pass through another entity as an intermediate path or conduit.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef538105548190a771cc5a0cf8c211 completed April 27, 2026, 12:16 p.m.
NER Named-entity recognition batch_69f62dff9b3881908db626f491ad11ed completed May 2, 2026, 5:01 p.m.
PD Predicate disambiguation batch_69f62c1762f881908c25e8f70ecd5041 completed May 2, 2026, 4:53 p.m.
Created at: April 27, 2026, 12:53 p.m.