Triple
T27459127
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Arganzuela Footbridge |
E692683
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | contemporary bridge |
C47043
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: contemporary bridge Context triple: [Arganzuela Footbridge, instanceOf, contemporary bridge]
-
A.
modern bridge
chosen
A modern bridge is a contemporary engineered structure designed to efficiently span physical obstacles such as water, valleys, or roads using advanced materials and construction techniques to support transportation and connectivity.
-
B.
pair of bridges
A pair of bridges is a conceptual structure representing two interconnected or complementary pathways that together enable traversal or connection between separate points or domains.
-
C.
bridge ensemble
A bridge ensemble is a coordinated group of bridges, either physically connected or conceptually related, designed or analyzed as a collective system for structural, functional, or aesthetic purposes.
-
D.
deck arch bridge
A deck arch bridge is a type of arch bridge where the roadway or deck is positioned on top of the arch structure, which supports the load from below.
-
E.
concrete bridge
A concrete bridge is a structure built primarily from reinforced or prestressed concrete to span physical obstacles such as roads, rivers, or valleys, providing a durable pathway for vehicles, pedestrians, or rail traffic.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef5207903881909427745cda05d27a |
completed | April 27, 2026, 12:09 p.m. |
Created at: April 27, 2026, 12:49 p.m.