Triple
T27451555
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Runway 5L |
E692455
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | left-side runway |
C8054
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: left-side runway Context triple: [Runway 5L, instanceOf, left-side runway]
-
A.
parallel runway
A parallel runway is one of two or more runways at an airport that are aligned in the same direction and used simultaneously or independently to increase traffic capacity and operational efficiency.
-
B.
airport runway
An airport runway is a long, specially prepared strip of land or pavement where aircraft take off and land, designed with specific markings, lighting, and surface strength to ensure safe operations.
-
C.
paved runway
A paved runway is a specially prepared, hard-surfaced strip of land at an airport designed to support the takeoff and landing of aircraft.
-
D.
runway end designation
chosen
A runway end designation is the alphanumeric identifier assigned to one end of a runway, typically based on its magnetic heading, used to distinguish it from the opposite end and aid in navigation and operations.
-
E.
beach runway
A beach runway is a stretch of sandy shoreline specially designated and prepared for aircraft takeoffs and landings, typically used in remote or island locations where conventional paved runways are impractical.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef5206c9248190b5975c2a7f9d229c |
completed | April 27, 2026, 12:09 p.m. |
Created at: April 27, 2026, 12:47 p.m.