Triple
T27384739
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Osorkon III |
E691336
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | King of Upper Egypt |
C18760
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: King of Upper Egypt Context triple: [Osorkon III, instanceOf, King of Upper Egypt]
-
A.
king of Upper Egypt
chosen
A king of Upper Egypt is the sovereign ruler who governed the southern region of ancient Egypt, centered around cities like Thebes, often before and during its unification with Lower Egypt.
-
B.
King of Upper and Lower Egypt
The King of Upper and Lower Egypt is the sovereign ruler who unites and governs both regions of ancient Egypt, symbolizing political and divine authority over the entire land.
-
C.
King of Egypt
The King of Egypt is the supreme monarch who holds ultimate political, religious, and military authority over the Egyptian state and its people.
-
D.
ruler of Sais
A ruler of Sais is the sovereign authority governing the ancient Egyptian city of Sais, overseeing its political, religious, and administrative affairs within the broader regional or dynastic context.
-
E.
ruler of Meroë
A ruler of Meroë is the sovereign monarch—often titled king or kandake—who governed the ancient Kushite city of Meroë, overseeing its political, military, economic, and religious life.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef520386788190bc92cfcd97ebb67a |
completed | April 27, 2026, 12:09 p.m. |
Created at: April 27, 2026, 12:24 p.m.