Triple
T27373931
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Pena Park |
E690408
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | romantic-era landscape garden |
C5306
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: romantic-era landscape garden Context triple: [Pena Park, instanceOf, romantic-era landscape garden]
-
A.
historic garden
chosen
A historic garden is a designed outdoor space of recognized cultural, aesthetic, or historical significance, preserved or restored to reflect the landscape styles, plantings, and features of a particular period or tradition.
-
B.
Palladian country house design
A Palladian country house design is a symmetrical, classically inspired rural residence characterized by temple-front porticos, strict proportional harmony, and restrained ornamentation derived from the architecture of Andrea Palladio.
-
C.
Romantic landscape painting
A romantic landscape painting is an artwork that portrays nature as a dramatic, emotional, and often sublime setting, emphasizing mood, atmosphere, and the viewer’s subjective experience over realistic representation.
-
D.
formal garden
A formal garden is a carefully designed outdoor space characterized by symmetrical layouts, geometric shapes, and meticulously maintained plants arranged to create order and visual harmony.
-
E.
rural historic landscape
A rural historic landscape is a geographically defined area of countryside whose land use, features, and spatial organization reflect the historical patterns, activities, and cultural values of the people who shaped it over time.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef51ff826081909e42c8e2bfb97941 |
completed | April 27, 2026, 12:09 p.m. |
Created at: April 27, 2026, 12:20 p.m.