Triple
T2736163
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Carson Range |
E60634
|
entity |
| Predicate | hasRoadCrossing |
P16436
|
FINISHED |
| Object |
U.S. Route 50 near Spooner Summit
U.S. Route 50 near Spooner Summit is a high-elevation mountain highway segment in the Sierra Nevada’s Carson Range that serves as a key east–west route between Lake Tahoe and Carson City, Nevada.
|
E293378
|
NE FINISHED |
How this triple was built (4 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: U.S. Route 50 near Spooner Summit | Statement: [Carson Range, hasRoadCrossing, U.S. Route 50 near Spooner Summit]
NED1
Entity disambiguation (via context triple)
gpt-5-mini-2025-08-07
Target entity: U.S. Route 50 near Spooner Summit Context triple: [Carson Range, hasRoadCrossing, U.S. Route 50 near Spooner Summit]
-
A.
U.S. Route 50 corridor vicinity
The U.S. Route 50 corridor vicinity is a transportation and development belt running along U.S. Route 50 through the Virginia Range area, serving as a key east–west travel and access route.
-
B.
U.S. Route 501
U.S. Route 501 is a U.S. Highway running through Virginia and North Carolina that serves as a key north–south transportation corridor connecting cities such as Durham and Myrtle Beach.
-
C.
U.S. Route 50 Business
U.S. Route 50 Business is a business loop of U.S. Route 50 that serves local traffic and commercial areas in and around Pueblo, Colorado.
-
D.
U.S. Route 36 corridor
The U.S. Route 36 corridor is a major east–west transportation route across the central United States, linking numerous communities and regional highways along its path.
-
E.
U.S. Route 54
U.S. Route 54 is a major northeast–southwest U.S. highway that runs from El Paso, Texas, to Griggsville, Illinois, passing through several states in the central United States.
- F. None of above. chosen
- G. Unsure - the case is ambiguous/there is not enough information to decide.
NEDg
Description generation
gpt-5.1
Instruction
Generate a one-sentence description of the target entity. You are given a context triple in the form (subject, predicate, object), where the object is the target entity. # Instructions Use the triple to infer relevant information about the entity. Describe the entity based on what is most defining, well-known. Avoid repeating the information from the triple, unless really essential. # Response Format Return only the sentence: "Description: [one-sentence description of the target entity]"
Input
Entity: U.S. Route 50 near Spooner Summit Triple: [Carson Range, hasRoadCrossing, U.S. Route 50 near Spooner Summit]
Generated description
U.S. Route 50 near Spooner Summit is a high-elevation mountain highway segment in the Sierra Nevada’s Carson Range that serves as a key east–west route between Lake Tahoe and Carson City, Nevada.
NED2
Entity disambiguation (via description)
gpt-5-mini-2025-08-07
Target entity: U.S. Route 50 near Spooner Summit Target entity description: U.S. Route 50 near Spooner Summit is a high-elevation mountain highway segment in the Sierra Nevada’s Carson Range that serves as a key east–west route between Lake Tahoe and Carson City, Nevada.
-
A.
U.S. Route 50 corridor vicinity
The U.S. Route 50 corridor vicinity is a transportation and development belt running along U.S. Route 50 through the Virginia Range area, serving as a key east–west travel and access route.
-
B.
U.S. Route 501
U.S. Route 501 is a U.S. Highway running through Virginia and North Carolina that serves as a key north–south transportation corridor connecting cities such as Durham and Myrtle Beach.
-
C.
U.S. Route 50 Business
U.S. Route 50 Business is a business loop of U.S. Route 50 that serves local traffic and commercial areas in and around Pueblo, Colorado.
-
D.
U.S. Route 36 corridor
The U.S. Route 36 corridor is a major east–west transportation route across the central United States, linking numerous communities and regional highways along its path.
-
E.
U.S. Route 54
U.S. Route 54 is a major northeast–southwest U.S. highway that runs from El Paso, Texas, to Griggsville, Illinois, passing through several states in the central United States.
- F. None of above. chosen
Provenance (5 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4b77febc819095603eb012cd141b |
completed | March 6, 2026, 9:47 p.m. |
| NER | Named-entity recognition | batch_69abdb11c66c81909058f2978aa5fae9 |
completed | March 7, 2026, 8 a.m. |
| NED1 | Entity disambiguation (via context triple) | batch_69afb6a37fdc8190bcdb33d7352d9e16 |
completed | March 10, 2026, 6:13 a.m. |
| NEDg | Description generation | batch_69afb734d7b08190aeb95e8a9199fb10 |
completed | March 10, 2026, 6:16 a.m. |
| NED2 | Entity disambiguation (via description) | batch_69afb7c3fe7c8190bbbd6ce3157b1d56 |
completed | March 10, 2026, 6:18 a.m. |
Created at: March 6, 2026, 9:56 p.m.