Triple

T27359761
Position Surface form Disambiguated ID Type / Status
Subject Eric G. Stacey E685787 entity
Predicate instanceOf P0 FINISHED
Object film assistant director C27595 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: film assistant director
Context triple: [Eric G. Stacey, instanceOf, film assistant director]
  • A. assistant film director chosen
    An assistant film director supports the main director by coordinating on-set activities, managing the shooting schedule, communicating instructions to cast and crew, and ensuring that production runs smoothly and efficiently.
  • B. production assistant
    A production assistant is an entry-level crew member who supports various logistical, administrative, and on-set tasks to help ensure a film, television, or media production runs smoothly.
  • C. film supervisor
    A film supervisor oversees and coordinates key aspects of a film’s production—such as departments, schedules, budgets, and creative continuity—to ensure the project is completed efficiently and in line with the director’s vision.
  • D. film editor
    A film editor is a professional who selects, arranges, and refines recorded footage, sound, and visual elements to craft a coherent and engaging final motion picture.
  • E. cinematographer
    A cinematographer is the visual storyteller responsible for crafting a film’s look through camera work, lighting, and shot composition in collaboration with the director.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef14887c288190931b8431fdbf53c4 completed April 27, 2026, 7:47 a.m.
Created at: April 27, 2026, 11:53 a.m.