Triple

T27356685
Position Surface form Disambiguated ID Type / Status
Subject Development Flight Instrumentation E685703 entity
Predicate monitoredPhase P162222 FINISHED
Object reentry LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: reentry | Statement: [Development Flight Instrumentation, monitoredPhase, reentry]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: monitoredPhase
Context triple: [Development Flight Instrumentation, monitoredPhase, reentry]
  • A. monitoredPhase chosen
    Indicates that one entity observes, tracks, or supervises a specific phase or stage in a process associated with another entity.
  • B. monitoredFor
    Indicates that one entity is being observed or tracked over time to detect, assess, or manage the occurrence or progression of another entity (such as a condition, event, or risk).
  • C. isMonitored
    Indicates that an entity is being actively observed, tracked, or supervised by another entity or system.
  • D. targetsPhase
    Indicates that an action, process, or entity is specifically directed toward or intended to affect a particular phase or stage within a larger sequence or lifecycle.
  • E. majorPhase
    Indicates that one phase is a primary or dominant stage within a larger process, lifecycle, or sequence.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef14887c288190931b8431fdbf53c4 completed April 27, 2026, 7:47 a.m.
NER Named-entity recognition batch_69f62cd2ceb481908cd9fae52a542206 completed May 2, 2026, 4:56 p.m.
PD Predicate disambiguation batch_69f62c1762f881908c25e8f70ecd5041 completed May 2, 2026, 4:53 p.m.
Created at: April 27, 2026, 11:51 a.m.