Triple

T27343671
Position Surface form Disambiguated ID Type / Status
Subject Falcon 9 first stage booster B1031 E684174 entity
Predicate instanceOf P0 FINISHED
Object Falcon 9 first stage booster C11848 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Falcon 9 first stage booster
Context triple: [Falcon 9 first stage booster B1031, instanceOf, Falcon 9 first stage booster]
  • A. expendable launch vehicle stage
    An expendable launch vehicle stage is a non-reusable rocket segment that houses propulsion, propellant, and associated systems, designed to operate for a specific phase of flight and then be discarded once its fuel is depleted.
  • B. orbital launch vehicle first stage chosen
    The orbital launch vehicle first stage is the initial propulsion segment of a rocket that provides the primary thrust to lift the vehicle off the ground and accelerate it through the lower atmosphere before separating for subsequent stages to continue to orbit.
  • C. Saturn V mobile launcher
    The Saturn V mobile launcher was a massive, self-contained launch platform and service structure that transported, supported, and provided umbilical connections to the Saturn V rocket from assembly to liftoff.
  • D. rocket upper stage
    A rocket upper stage is the final propulsion segment of a launch vehicle, designed to operate in near-vacuum conditions to place payloads into their intended orbits or trajectories after lower stages have completed initial ascent.
  • E. rocket booster
    A rocket booster is a powerful propulsion component that provides the initial thrust needed to lift a launch vehicle off the ground and accelerate it through the early stages of flight.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef1480a76481908684256ddd5bfda3 completed April 27, 2026, 7:47 a.m.
Created at: April 27, 2026, 11:44 a.m.