Triple
T27342376
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | ITC Depok |
E684141
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | multi-story shopping complex |
C1998
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: multi-story shopping complex Context triple: [ITC Depok, instanceOf, multi-story shopping complex]
-
A.
shopping centre
A shopping centre is a large complex of retail stores, services, and often entertainment facilities planned and managed as a single commercial property.
-
B.
shopping mall
chosen
A shopping mall is a large, often enclosed commercial complex that houses multiple retail stores, dining options, and services connected by shared walkways and common areas.
-
C.
commercial and residential complex
A commercial and residential complex is a mixed-use development that integrates living spaces with retail, office, and service facilities within a unified property or group of buildings.
-
D.
civic building complex
A civic building complex is a coordinated group of public structures and spaces designed to house governmental, administrative, and community services within a unified physical setting.
-
E.
real estate complex
A real estate complex is a group of buildings and associated land, planned and developed as a unified property for residential, commercial, or mixed-use purposes.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef1480a76481908684256ddd5bfda3 |
completed | April 27, 2026, 7:47 a.m. |
Created at: April 27, 2026, 11:43 a.m.