Triple

T27338885
Position Surface form Disambiguated ID Type / Status
Subject Steamboat Bill Memorial Bridge E690035 entity
Predicate instanceOf P0 FINISHED
Object memorial bridge C47958 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: memorial bridge
Context triple: [Steamboat Bill Memorial Bridge, instanceOf, memorial bridge]
  • A. 교량 chosen
    교량은 도로나 철도, 보행로 등이 강, 계곡, 도로 등 장애물을 안전하고 효율적으로 횡단할 수 있도록 상부구조와 하부구조로 이루어진 구조물이다.
  • B. river bridge
    A river bridge is a structure built to span a river, providing a stable pathway for vehicles, pedestrians, or rail traffic to cross from one bank to the other.
  • C. tram bridge
    A tram bridge is a dedicated elevated structure that carries tram tracks over obstacles such as roads, rivers, or other terrain features to ensure uninterrupted tramway operation.
  • D. granite bridge
    A granite bridge is a durable, load-bearing structure constructed primarily from granite blocks or slabs, designed to span physical obstacles such as rivers, roads, or valleys.
  • E. dam bridge
    A dam bridge is a structure that combines the functions of a dam for water retention and control with a bridge that provides a transportation route across the impounded water or river.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef355e5b388190a8fc1eba9b4a6656 completed April 27, 2026, 10:07 a.m.
Created at: April 27, 2026, 11:41 a.m.