Triple
T2732834
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Methil Power Station (former) |
E60354
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | former power station |
C5370
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: former power station Context triple: [Methil Power Station (former), instanceOf, former power station]
-
A.
former industrial plant
chosen
A former industrial plant is a decommissioned facility that once housed large-scale manufacturing or processing operations, often leaving behind substantial physical infrastructure and potential environmental impacts.
-
B.
renewable energy power station
A renewable energy power station is a facility that generates electricity from naturally replenishing resources such as sunlight, wind, water, or geothermal heat, converting them into usable power for distribution to consumers.
-
C.
former railway station
A former railway station is a decommissioned train facility that once served passengers or freight but is no longer in active railway use.
-
D.
former gravel pit
A former gravel pit is a previously excavated site where gravel was extracted, now typically abandoned, reclaimed, or repurposed for new land uses such as recreation, habitat restoration, or development.
-
E.
steam pumping station
A steam pumping station is an industrial facility that uses steam-powered engines to drive pumps for moving water or other fluids, typically for municipal water supply, drainage, or industrial processes.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4b75cd908190b691ef0d1801acda |
completed | March 6, 2026, 9:47 p.m. |
Created at: March 6, 2026, 9:56 p.m.