Triple

T27326427
Position Surface form Disambiguated ID Type / Status
Subject Enderbury Island E689661 entity
Predicate condominiumEndYear P214 FINISHED
Object 1979 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 1979 | Statement: [Enderbury Island, condominiumEndYear, 1979]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: condominiumEndYear
Context triple: [Enderbury Island, condominiumEndYear, 1979]
  • A. condominiumStartYear
    Indicates the year in which a condominium was first established, opened, or began its official existence.
  • B. endYear chosen
    Indicates the year in which an event, state, or relationship comes to an end.
  • C. renovationYear
    Indicates the year in which an entity underwent renovation or significant refurbishment.
  • D. yearBuilt
    Indicates the specific year in which something (typically a structure or object) was constructed or completed.
  • E. indentureEndYear
    Indicates the calendar year in which an indenture (a formal legal or contractual agreement) is scheduled to terminate or has terminated.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef355d4cb08190ab032c0a2e7d3753 completed April 27, 2026, 10:07 a.m.
NER Named-entity recognition batch_69f6352fdb788190b9bad30243690743 completed May 2, 2026, 5:32 p.m.
PD Predicate disambiguation batch_69f631850ae08190a0ba51e4f1e4ccb3 completed May 2, 2026, 5:16 p.m.
Created at: April 27, 2026, 11:36 a.m.