Triple
T27287342
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Irma Serrano |
E688514
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | federal senator of Mexico |
C52700
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: federal senator of Mexico Context triple: [Irma Serrano, instanceOf, federal senator of Mexico]
-
A.
president of Mexico
The president of Mexico is the head of state and government of the United Mexican States, responsible for leading the federal executive branch, implementing national policy, and representing the country domestically and internationally.
-
B.
former senator of the Philippines
A former senator of the Philippines is an individual who previously served as an elected member of the Philippine Senate but no longer holds that office.
-
C.
U.S. Senator
A U.S. Senator is an elected member of the United States Senate who represents an entire state at the federal level, participates in creating and voting on national legislation, and serves six-year terms with responsibilities including oversight, advice, and consent on key governmental appointments and treaties.
-
D.
Filipino senator
A Filipino senator is an elected member of the Philippine Senate who crafts, debates, and approves national legislation, exercises oversight of the executive branch, and represents the interests of the Filipino people at the national level.
-
E.
term of the federal lower house of Mexico
The term of the federal lower house of Mexico is the fixed period during which elected deputies serve in the Chamber of Deputies before a new legislative election is held.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef355998e08190bdff849e8f33adce |
completed | April 27, 2026, 10:07 a.m. |
Created at: April 27, 2026, 11:12 a.m.