Triple
T27264378
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Metroplús BRT feeders |
E687857
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bus rapid transit feeder service |
C26510
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bus rapid transit feeder service Context triple: [Metroplús BRT feeders, instanceOf, bus rapid transit feeder service]
-
A.
feeder bus service
chosen
A feeder bus service is a local transit route that connects neighborhoods or outlying areas to major transportation hubs or mainline routes, facilitating convenient transfers and extended network access.
-
B.
bus rapid transit facility
A bus rapid transit facility is a dedicated infrastructure element—such as stations, lanes, and terminals—designed to support high-capacity, fast, and reliable bus-based public transportation.
-
C.
bus rapid transit line
A bus rapid transit line is a high-capacity bus corridor that uses dedicated lanes, priority signaling, and streamlined stations to provide fast, reliable, rail-like transit service.
-
D.
fixed-route transit service
Fixed-route transit service is a public transportation mode that operates vehicles along predetermined paths with scheduled stops and timetables, regardless of individual passenger requests.
-
E.
regional bus service
A regional bus service is a public transportation system that operates scheduled bus routes connecting multiple towns or cities within a specific geographic area.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef3557abc481908bf3c146f0f3356a |
completed | April 27, 2026, 10:07 a.m. |
Created at: April 27, 2026, 10:54 a.m.