Triple

T27264166
Position Surface form Disambiguated ID Type / Status
Subject Line J E687850 entity
Predicate instanceOf P0 FINISHED
Object cable-propelled transit line C1080 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: cable-propelled transit line
Context triple: [Line J, instanceOf, cable-propelled transit line]
  • A. automated guideway transit line
    An automated guideway transit line is a fully automated, driverless rail or rubber-tired transit system operating on a dedicated guideway, typically used for short- to medium-distance urban or campus circulation.
  • B. cable car system chosen
    A cable car system is a transportation network in which vehicles are pulled by continuously moving cables, typically used to move people or goods along steep or inaccessible routes such as mountainsides or urban hills.
  • C. monorail transit line
    A monorail transit line is an elevated or ground-level guided transportation system in which trains run on a single rail, typically used for urban or campus passenger service.
  • D. continuous transport system
    A continuous transport system is a material handling arrangement that moves goods or resources in an uninterrupted flow along a fixed path using devices such as conveyors, pipelines, or automated tracks.
  • E. light rail transit line
    A light rail transit line is a fixed-route urban or suburban rail corridor using electrically powered, relatively low-capacity trains that operate on dedicated or semi-exclusive tracks to provide frequent, short- to medium-distance passenger service.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef3557abc481908bf3c146f0f3356a completed April 27, 2026, 10:07 a.m.
Created at: April 27, 2026, 10:54 a.m.