Triple

T27261652
Position Surface form Disambiguated ID Type / Status
Subject Exit 20 (Nishi-Waseda Station) E687781 entity
Predicate instanceOf P0 FINISHED
Object pedestrian underpass exit C36460 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: pedestrian underpass exit
Context triple: [Exit 20 (Nishi-Waseda Station), instanceOf, pedestrian underpass exit]
  • A. pedestrian access point chosen
    A pedestrian access point is a designated location where people on foot can enter, exit, or cross into a specific area, pathway, or transportation facility.
  • B. railway station exit
    A railway station exit is a designated passage or gateway through which passengers leave the station premises to access external streets, transport links, or surrounding areas.
  • C. roadway underpass
    A roadway underpass is a structure that allows a road to pass beneath another road, railway, or obstacle, providing grade separation and uninterrupted traffic flow.
  • D. pedestrian walkway
    A pedestrian walkway is a designated path or corridor intended exclusively or primarily for people traveling on foot, providing safe and convenient passage separated from vehicular traffic.
  • E. pedestrian skybridge
    A pedestrian skybridge is an elevated, enclosed or open walkway that connects two or more buildings above ground level, allowing people to cross safely and conveniently without interacting with street traffic.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef3557abc481908bf3c146f0f3356a completed April 27, 2026, 10:07 a.m.
Created at: April 27, 2026, 10:53 a.m.