Triple

T27238255
Position Surface form Disambiguated ID Type / Status
Subject Piraeus building E687126 entity
Predicate instanceOf P0 FINISHED
Object residential and office complex C24772 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: residential and office complex
Context triple: [Piraeus building, instanceOf, residential and office complex]
  • A. commercial and residential complex chosen
    A commercial and residential complex is a mixed-use development that integrates living spaces with retail, office, and service facilities within a unified property or group of buildings.
  • B. industrial and residential complex
    A mixed-use development that integrates industrial facilities with residential housing, designed to support both production activities and everyday living within a coordinated, shared environment.
  • C. real estate complex
    A real estate complex is a group of buildings and associated land, planned and developed as a unified property for residential, commercial, or mixed-use purposes.
  • D. office building complex
    An office building complex is a group of interconnected or closely situated office structures designed to provide workspace, shared amenities, and supporting services for multiple businesses or organizations.
  • E. commercial and industrial complex
    A commercial and industrial complex is a large, planned development that integrates multiple business, retail, and manufacturing or warehousing facilities within a shared infrastructure and site.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef355547408190b5ca0d777c65040a completed April 27, 2026, 10:07 a.m.
Created at: April 27, 2026, 10:35 a.m.