Triple
T2718070
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Third Party System |
E60014
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | integration component |
C11747
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: integration component Context triple: [Third Party System, instanceOf, integration component]
-
A.
integro-differential equations
Integro-differential equations are mathematical equations that involve both integrals and derivatives of an unknown function, capturing systems where current rates of change depend on accumulated past behavior.
-
B.
integrated bar
An integrated bar is a combined countertop and seating area, often attached to a kitchen or living space, designed for casual dining, serving, and socializing in a unified layout.
-
C.
infraorder
An infraorder is a taxonomic rank below suborder and above superfamily used to group closely related organisms within an order based on shared evolutionary characteristics.
-
D.
component container
A component container is an object that holds, manages, and coordinates the lifecycle and interactions of a collection of related components.
-
E.
reserve component
A reserve component is a supplementary part of a system or organization that remains available for use when primary resources are insufficient, unavailable, or require reinforcement.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4b746d248190958e052045c09255 |
completed | March 6, 2026, 9:47 p.m. |
Created at: March 6, 2026, 9:55 p.m.