Triple
T27175146
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Suwanee Town Center |
E683023
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | public park complex |
C18373
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: public park complex Context triple: [Suwanee Town Center, instanceOf, public park complex]
-
A.
public park building
A public park building is a structure within a park that provides shared amenities—such as restrooms, shelters, visitor centers, or recreational facilities—to support and enhance public use of the outdoor space.
-
B.
private park
A private park is a landscaped outdoor area owned and controlled by an individual or organization, with access restricted to authorized users rather than the general public.
-
C.
park complex
chosen
A park complex is a large, planned outdoor area that combines multiple recreational, natural, and community facilities—such as playgrounds, sports fields, gardens, and walking paths—into a unified public space.
-
D.
public parkway
A public parkway is a landscaped thoroughfare, often featuring roads, walking paths, and green spaces, designed for scenic travel and recreational use by the public.
-
E.
multi-level parking facility
A multi-level parking facility is a structured building with multiple stacked floors designed to maximize vehicle parking capacity within a limited land area.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eefad086808190ab89816c0c300476 |
completed | April 27, 2026, 5:57 a.m. |
Created at: April 27, 2026, 9:25 a.m.