Triple

T27172570
Position Surface form Disambiguated ID Type / Status
Subject Bogotá–Soacha urban corridor E682957 entity
Predicate urbanPlanningConcern P91028 FINISHED
Object metropolitan coordination between Bogotá and Soacha LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: metropolitan coordination between Bogotá and Soacha | Statement: [Bogotá–Soacha urban corridor, urbanPlanningConcern, metropolitan coordination between Bogotá and Soacha]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: urbanPlanningConcern
Context triple: [Bogotá–Soacha urban corridor, urbanPlanningConcern, metropolitan coordination between Bogotá and Soacha]
  • A. urbanPlanningForm
    Indicates the specific type or structure of urban planning approach applied to a place or development.
  • B. urbanPlanningFunction
    Indicates a functional role or purpose that something serves within the planning, organization, or management of urban spaces and infrastructure.
  • C. urbanPlanningTheme chosen
    Indicates a thematic relationship in which an entity is concerned with, addresses, or is categorized under topics related to urban planning.
  • D. landUseIssues
    Indicates conflicts, problems, or concerns arising from how land is used, managed, or designated.
  • E. urbanPlanBy
    Indicates that an urban plan is created, designed, or authored by a specific agent or authority.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eefad086808190ab89816c0c300476 completed April 27, 2026, 5:57 a.m.
NER Named-entity recognition batch_69f63fd6c68481908c542aa03e297b9c completed May 2, 2026, 6:17 p.m.
PD Predicate disambiguation batch_69f63c663be481908f233d25d28713a4 completed May 2, 2026, 6:03 p.m.
Created at: April 27, 2026, 9:24 a.m.