Triple

T27172059
Position Surface form Disambiguated ID Type / Status
Subject The Queensway streetcar tracks E682943 entity
Predicate instanceOf P0 FINISHED
Object streetcar right-of-way C22083 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: streetcar right-of-way
Context triple: [The Queensway streetcar tracks, instanceOf, streetcar right-of-way]
  • A. streetcar route
    A streetcar route is a predefined path along public streets that streetcars follow to provide scheduled passenger transportation between specific stops or terminals.
  • B. streetcar stop
    A streetcar stop is a designated location along a streetcar line where passengers can safely board and alight from streetcars, often marked with signage, shelters, or platforms.
  • C. shared right-of-way
    A shared right-of-way is a designated space or corridor where multiple users—such as vehicles, cyclists, and pedestrians—have legal access and overlapping rights to travel or pass.
  • D. streetcar corridor chosen
    A streetcar corridor is a designated urban transit route where streetcars operate along fixed tracks, typically integrated into city streets, to provide frequent, high-capacity public transportation and support adjacent mixed-use development.
  • E. streetcar loop
    A streetcar loop is a track configuration, often circular or balloon-shaped, that allows streetcars to turn around and reverse direction without needing to reverse their orientation.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eefad086808190ab89816c0c300476 completed April 27, 2026, 5:57 a.m.
Created at: April 27, 2026, 9:24 a.m.