Triple

T27132356
Position Surface form Disambiguated ID Type / Status
Subject Factory Without Bosses E681592 entity
Predicate instanceOf P0 FINISHED
Object Argentine ceramics plant C19193 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Argentine ceramics plant
Context triple: [Factory Without Bosses, instanceOf, Argentine ceramics plant]
  • A. Argentine Army facility
    An Argentine Army facility is a military installation in Argentina used by the Argentine Army for operations, training, administration, logistics, or support activities.
  • B. pottery factory chosen
    A pottery factory is an industrial facility where clay is processed, shaped, fired, and often decorated to mass-produce ceramic goods such as tableware, tiles, and decorative items.
  • C. Yoshimoto Kogyo facility
    A Yoshimoto Kogyo facility is a venue or complex owned or operated by the Japanese entertainment company Yoshimoto Kogyo, used for producing, rehearsing, and hosting performances, events, and related entertainment activities.
  • D. Buenos Aires Underground station
    A Buenos Aires Underground station is a designated facility within the city's subway network where trains stop to allow passengers to board, alight, and transfer between lines.
  • E. Argentine Antarctic base
    An Argentine Antarctic base is a permanent or seasonal research and logistics station established by Argentina in Antarctica to support scientific studies, territorial presence, and polar operations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eefacbcc2081909ebf00daa23f1981 completed April 27, 2026, 5:57 a.m.
Created at: April 27, 2026, 9:05 a.m.