Triple
T27116205
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Shenandoah National Park transportation network |
E686851
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | park transportation system |
C2489
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: park transportation system Context triple: [Shenandoah National Park transportation network, instanceOf, park transportation system]
-
A.
public transit system
A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
-
B.
public transportation infrastructure
chosen
Public transportation infrastructure encompasses the physical and organizational systems—such as buses, trains, stations, tracks, and supporting facilities—that enable the efficient movement of people via shared transit services.
-
C.
streetcar system
A streetcar system is an urban public transit network that operates rail vehicles on fixed tracks, typically embedded in city streets, to transport passengers along defined routes.
-
D.
park system
A park system is an organized network of public parks and green spaces managed collectively to provide recreation, conservation, and aesthetic benefits to a community or region.
-
E.
park-and-ride facility
A park-and-ride facility is a designated parking area where commuters leave their vehicles and transfer to public transportation for the remainder of their journey.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef148c2b588190afc15b529f7af845 |
completed | April 27, 2026, 7:47 a.m. |
Created at: April 27, 2026, 8:56 a.m.