Triple

T27107917
Position Surface form Disambiguated ID Type / Status
Subject Seattle Opera House E686630 entity
Predicate majorRenovationCompletion P740 FINISHED
Object 2003 LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: 2003 | Statement: [Seattle Opera House, majorRenovationCompletion, 2003]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: majorRenovationCompletion
Context triple: [Seattle Opera House, majorRenovationCompletion, 2003]
  • A. renovationCompleted chosen
    Indicates that a renovation process for an entity has been fully finished and is no longer in progress.
  • B. renovationResult
    Indicates the outcome or state produced by a renovation process, linking the renovation activity to its resulting condition or product.
  • C. hasRenovation
    Indicates that an entity has undergone, is undergoing, or is associated with a renovation process or renovation event.
  • D. constructionCompleted
    Indicates that a construction process or project has been fully finished and reached its completed state.
  • E. roofCompleted
    Indicates that the construction or installation of a roof on a structure has been fully finished.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef148accd48190b6ed6e13a15f2a4f completed April 27, 2026, 7:47 a.m.
NER Named-entity recognition batch_69f7c777e924819081a6634f549fe552 completed May 3, 2026, 10:08 p.m.
PD Predicate disambiguation batch_69f7c475c58c8190a883554231e88c88 completed May 3, 2026, 9:56 p.m.
Created at: April 27, 2026, 8:52 a.m.