Triple
T27099669
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Garden State Parkway in Clifton |
E686404
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | limited-access toll road segment |
C3932
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: limited-access toll road segment Context triple: [Garden State Parkway in Clifton, instanceOf, limited-access toll road segment]
-
A.
controlled-access highway
chosen
A controlled-access highway is a high-speed road designed for uninterrupted traffic flow, featuring limited entry and exit points via ramps, no at-grade intersections, and restrictions on pedestrian and non-motorized access.
-
B.
highway segment
A highway segment is a continuous portion of a highway between two defined endpoints, such as interchanges, intersections, or mile markers, characterized by consistent physical and operational attributes.
-
C.
toll road
A toll road is a roadway for which drivers must pay a fee, typically at designated points or electronically, to use its infrastructure.
-
D.
toll highway
A toll highway is a high-speed road where drivers must pay a fee, typically at toll booths or electronically, to use the roadway for travel.
-
E.
high-occupancy toll lanes
High-occupancy toll lanes are special highway lanes that allow vehicles with multiple occupants to travel for free or at reduced cost while single-occupant vehicles can use them by paying a variable toll designed to manage congestion and maintain faster traffic flow.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef1489f8b481908e24a1985982bd26 |
completed | April 27, 2026, 7:47 a.m. |
Created at: April 27, 2026, 8:47 a.m.