Triple

T27075279
Position Surface form Disambiguated ID Type / Status
Subject LI-2200 silica tiles E685446 entity
Predicate instanceOf P0 FINISHED
Object thermal protection system component C10280 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: thermal protection system component
Context triple: [LI-2200 silica tiles, instanceOf, thermal protection system component]
  • A. ablative thermal protection system chosen
    An ablative thermal protection system is a heat shield that protects a spacecraft by sacrificially charring, melting, and eroding material to absorb and carry away extreme reentry heat.
  • B. thermal control system
    A thermal control system is a coordinated set of components and mechanisms designed to monitor, regulate, and maintain desired temperature conditions within a physical environment or device.
  • C. space launch vehicle component
    A space launch vehicle component is a physical subsystem or part—such as engines, tanks, avionics, or structural elements—that contributes to the propulsion, guidance, structural integrity, or support functions required to deliver payloads from Earth to space.
  • D. spacecraft safety system
    A spacecraft safety system is an integrated set of hardware, software, and procedural controls designed to detect, prevent, and mitigate hazards to protect the vehicle, crew, payload, and mission throughout all phases of spaceflight.
  • E. Space Shuttle subsystem
    A Space Shuttle subsystem is a distinct functional component or collection of components within the Space Shuttle that performs a specific role—such as propulsion, life support, guidance, or power management—to enable safe and effective mission operations.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef14843b1481909d828b3d5a44550a completed April 27, 2026, 7:47 a.m.
Created at: April 27, 2026, 8:30 a.m.