Triple
T27058857
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Supai Tunnel |
E684979
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | man-made passageway |
C52448
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: man-made passageway Context triple: [Supai Tunnel, instanceOf, man-made passageway]
-
A.
engineered waterway
An engineered waterway is a human-made or heavily modified channel or system designed to control, convey, or manage water for purposes such as navigation, irrigation, drainage, flood control, or power generation.
-
B.
ropeway
A ropeway is an aerial transport system in which carriers such as cabins or chairs are suspended from and moved by one or more overhead cables between fixed terminals.
-
C.
ancient Roman tunnel
An ancient Roman tunnel is an underground passage engineered by the Romans, typically cut through rock or earth, to facilitate transportation, water conveyance, or drainage within their expansive infrastructure networks.
-
D.
canal aqueduct
A canal aqueduct is a bridge-like structure that carries a navigable waterway over obstacles such as rivers, valleys, roads, or other canals.
-
E.
roadway underpass
A roadway underpass is a structure that allows a road to pass beneath another road, railway, or obstacle, providing grade separation and uninterrupted traffic flow.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ef14829fac8190914bef9ecc3005d7 |
completed | April 27, 2026, 7:47 a.m. |
Created at: April 27, 2026, 8:20 a.m.