Triple

T27054224
Position Surface form Disambiguated ID Type / Status
Subject 伏木万葉埠頭 E684854 entity
Predicate instanceOf P0 FINISHED
Object 港湾施設 C16149 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: 港湾施設
Context triple: [伏木万葉埠頭, instanceOf, 港湾施設]
  • A. docking facility
    A docking facility is a designated structure or area where vehicles, vessels, or spacecraft securely attach for loading, unloading, maintenance, or passenger transfer.
  • B. maritime structure chosen
    A maritime structure is a man-made construction located in or near bodies of water, designed to support marine activities such as navigation, transportation, resource extraction, or coastal protection.
  • C. boat harbour
    A boat harbour is a sheltered body of water equipped with facilities for mooring, servicing, and protecting boats and small ships.
  • D. dry dock
    A dry dock is a narrow basin or vessel that can be flooded to allow a ship to be floated in, then drained to expose the hull for construction, maintenance, or repair.
  • E. shore establishment
    A shore establishment is a land-based facility that supports naval or maritime operations through administration, logistics, training, maintenance, or other essential services.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef14829fac8190914bef9ecc3005d7 completed April 27, 2026, 7:47 a.m.
Created at: April 27, 2026, 8:16 a.m.