Triple

T27050937
Position Surface form Disambiguated ID Type / Status
Subject YouTube Symphony Orchestra E684770 entity
Predicate instanceOf P0 FINISHED
Object online collaborative music project C12274 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: online collaborative music project
Context triple: [YouTube Symphony Orchestra, instanceOf, online collaborative music project]
  • A. collaborative project chosen
    A collaborative project is a coordinated effort in which multiple individuals or groups work together, sharing responsibilities, resources, and expertise to achieve a common goal.
  • B. avant-garde music project
    An avant-garde music project is an experimental artistic endeavor that challenges conventional musical structures and aesthetics through innovative sounds, techniques, and interdisciplinary concepts.
  • C. collaborative online platform
    A collaborative online platform is a digital environment that enables multiple users to work together in real time or asynchronously by sharing information, coordinating tasks, and communicating through integrated tools and services.
  • D. rock music collaboration
    A rock music collaboration is a creative partnership where two or more artists, bands, or producers from the rock genre work together to write, perform, or record shared musical projects.
  • E. live musical project
    A live musical project is a performance-focused endeavor in which musicians present music in real time to an audience, often incorporating unique arrangements, improvisation, and collaborative elements distinct from studio recordings.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69ef14829fac8190914bef9ecc3005d7 completed April 27, 2026, 7:47 a.m.
Created at: April 27, 2026, 8:14 a.m.