Triple
T27029352
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Hayman Island Airport |
E680876
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | private airstrip |
C1901
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: private airstrip Context triple: [Hayman Island Airport, instanceOf, private airstrip]
-
A.
airfield
chosen
An airfield is a designated area of land equipped with runways, taxiways, and minimal support facilities for the takeoff, landing, and ground movement of aircraft.
-
B.
airport runway
An airport runway is a long, specially prepared strip of land or pavement where aircraft take off and land, designed with specific markings, lighting, and surface strength to ensure safe operations.
-
C.
private aviation terminal
A private aviation terminal is a specialized airport facility that provides exclusive, streamlined services and amenities for private and corporate aircraft, their passengers, and crews.
-
D.
public airport
A public airport is a government- or publicly-owned aviation facility open for use by the general public, providing infrastructure and services for commercial, private, and cargo air transportation.
-
E.
seaplane base
A seaplane base is a designated water aerodrome, often with minimal shore facilities, where seaplanes and amphibious aircraft can take off, land, dock, and receive basic services.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eeeb5566f08190813daf896fa3da04 |
completed | April 27, 2026, 4:51 a.m. |
Created at: April 27, 2026, 7:13 a.m.