Triple
T27015066
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Boeing Philadelphia facility |
E680502
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | military rotorcraft production site |
C40763
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: military rotorcraft production site Context triple: [Boeing Philadelphia facility, instanceOf, military rotorcraft production site]
-
A.
U.S. Army helicopter facility
A U.S. Army helicopter facility is a specialized military installation that supports the operation, maintenance, training, and deployment of Army rotary-wing aircraft and their crews.
-
B.
helicopter manufacturer
A helicopter manufacturer is a company that designs, engineers, and produces helicopters and related rotorcraft systems for commercial, military, and private use.
-
C.
military helicopter
A military helicopter is a rotary-wing aircraft designed and equipped for combat, transport, reconnaissance, and support missions in military operations.
-
D.
rotorcraft development program
A rotorcraft development program is an organized, multi-phase effort to design, test, certify, and field new or improved rotary-wing aircraft to meet specified performance, safety, and mission requirements.
-
E.
aircraft factory
chosen
An aircraft factory is an industrial facility where aircraft and their components are designed, manufactured, assembled, and tested before delivery to customers.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eeeb53939c8190bd431f32b060f01f |
completed | April 27, 2026, 4:51 a.m. |
Created at: April 27, 2026, 7:05 a.m.