Triple

T27015066
Position Surface form Disambiguated ID Type / Status
Subject Boeing Philadelphia facility E680502 entity
Predicate instanceOf P0 FINISHED
Object military rotorcraft production site C40763 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: military rotorcraft production site
Context triple: [Boeing Philadelphia facility, instanceOf, military rotorcraft production site]
  • A. U.S. Army helicopter facility
    A U.S. Army helicopter facility is a specialized military installation that supports the operation, maintenance, training, and deployment of Army rotary-wing aircraft and their crews.
  • B. helicopter manufacturer
    A helicopter manufacturer is a company that designs, engineers, and produces helicopters and related rotorcraft systems for commercial, military, and private use.
  • C. military helicopter
    A military helicopter is a rotary-wing aircraft designed and equipped for combat, transport, reconnaissance, and support missions in military operations.
  • D. rotorcraft development program
    A rotorcraft development program is an organized, multi-phase effort to design, test, certify, and field new or improved rotary-wing aircraft to meet specified performance, safety, and mission requirements.
  • E. aircraft factory chosen
    An aircraft factory is an industrial facility where aircraft and their components are designed, manufactured, assembled, and tested before delivery to customers.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eeeb53939c8190bd431f32b060f01f completed April 27, 2026, 4:51 a.m.
Created at: April 27, 2026, 7:05 a.m.