Triple
T2701478
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Derby Wharf |
E59238
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | waterfront pier |
C5954
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: waterfront pier Context triple: [Derby Wharf, instanceOf, waterfront pier]
-
A.
waterfront pier complex
chosen
A waterfront pier complex is a multi-use structure extending over the water that integrates docking facilities, public promenades, and commercial or recreational amenities along the shoreline.
-
B.
waterfront district
A waterfront district is an urban or suburban area located along a body of water, characterized by mixed-use development, public access to the shoreline, and activities centered around recreation, commerce, and scenic views.
-
C.
seawall
A seawall is a coastal defense structure built parallel to the shoreline to protect land and infrastructure from wave action, erosion, and storm surges.
-
D.
fishing port
A fishing port is a coastal harbor facility where fishing vessels dock to unload catches, refuel, maintain equipment, and support the commercial fishing industry through processing, storage, and distribution services.
-
E.
marina
A marina is a specialized harbor facility that provides moorings, services, and amenities for recreational and small commercial boats and yachts.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69ab4ac66bc88190b9e4afa5fc843f72 |
completed | March 6, 2026, 9:44 p.m. |
Created at: March 6, 2026, 9:55 p.m.