Triple
T27003836
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Coons patch |
E680186
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | geometric modeling technique |
C10054
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: geometric modeling technique Context triple: [Coons patch, instanceOf, geometric modeling technique]
-
A.
geometric object
A geometric object is an abstract entity defined by points, lines, surfaces, or volumes in space, characterized by properties such as shape, size, position, and orientation.
-
B.
tool in geometric analysis
chosen
A tool in geometric analysis is a mathematical method, concept, or construction used to study and characterize the geometric and analytic properties of spaces, shapes, and mappings.
-
C.
geometric structure
A geometric structure is an abstract mathematical entity defined by sets of points and the relationships between them (such as distances, angles, or incidences) that determine its shape and spatial properties.
-
D.
geometric construction
A geometric construction is a precise method of creating geometric figures using only idealized tools (typically a straightedge and compass) according to specified rules and steps.
-
E.
architectural modeler
An architectural modeler is a professional who creates detailed physical or digital scale representations of buildings and structures to visualize, test, and communicate architectural designs.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eeeb52908c8190bd246244686aa455 |
completed | April 27, 2026, 4:51 a.m. |
Created at: April 27, 2026, 6:59 a.m.