Triple

T270035
Position Surface form Disambiguated ID Type / Status
Subject Clinton Engineer Works E5611 entity
Predicate instanceOf P0 FINISHED
Object Manhattan Project facility C702 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Manhattan Project facility
Context triple: [Clinton Engineer Works, instanceOf, Manhattan Project facility]
  • A. research facility
    A research facility is a specialized institution equipped with laboratories, instruments, and resources where scientists and experts systematically investigate, experiment, and develop new knowledge or technologies.
  • B. military installation
    A military installation is a designated facility or area where armed forces are stationed, trained, equipped, and supported to conduct defense and security operations.
  • C. nuclear weapons program
    A nuclear weapons program is an organized, often state-led effort to research, develop, test, produce, and maintain nuclear warheads and their delivery systems for military deterrence or potential use.
  • D. World War II site chosen
    A World War II site is a historically significant location directly associated with events, operations, or impacts of the Second World War, preserved or recognized for its cultural, military, or memorial value.
  • E. United States Army installation
    A United States Army installation is a designated military facility, base, or post that supports the housing, training, operations, logistics, and administration of Army personnel and equipment.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69a25853594c8190b05ec3a586ec88bf completed Feb. 28, 2026, 2:52 a.m.
Created at: Feb. 28, 2026, 2:57 a.m.