Triple

T27003060
Position Surface form Disambiguated ID Type / Status
Subject Mansfield station E680164 entity
Predicate hasElectrificationNearby P94567 FINISHED
Object Northeast Corridor electrification NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Northeast Corridor electrification | Statement: [Mansfield station, hasElectrificationNearby, Northeast Corridor electrification]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: hasElectrificationNearby
Context triple: [Mansfield station, hasElectrificationNearby, Northeast Corridor electrification]
  • A. isElectrificationPlanned
    Indicates that there is an intention or scheduled plan to add or upgrade electrical infrastructure or services to the referenced entity or area.
  • B. hasElectrificationStatus
    Indicates that an entity possesses a specified type or level of electrification (e.g., electrified, non-electrified, partially electrified).
  • C. electrificationUsedBy
    Indicates that a particular electrification system, method, or technology is employed or utilized by a given entity.
  • D. railElectrificationIncludes chosen
    Indicates that a rail electrification system or project encompasses, covers, or incorporates a specified segment, component, or area of railway infrastructure.
  • E. electrificationTerminusOf
    Indicates that a location or point serves as the end of an electrified section of a route, line, or network.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eeeb52908c8190bd246244686aa455 completed April 27, 2026, 4:51 a.m.
NER Named-entity recognition batch_69f6562fd3488190be1acd8c526a28d2 completed May 2, 2026, 7:53 p.m.
PD Predicate disambiguation batch_69f651a931748190a637e631a52bbfaa completed May 2, 2026, 7:34 p.m.
Created at: April 27, 2026, 6:59 a.m.