Triple

T26982283
Position Surface form Disambiguated ID Type / Status
Subject AGA lighthouse system E679634 entity
Predicate instanceOf P0 FINISHED
Object lighthouse illumination system C52330 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: lighthouse illumination system
Context triple: [AGA lighthouse system, instanceOf, lighthouse illumination system]
  • A. coastal lighthouse
    A coastal lighthouse is a tall, often cylindrical structure built along shorelines to emit a guiding light and navigational signals that warn ships of hazards and help them safely navigate coastal waters.
  • B. ornamental lighthouse
    An ornamental lighthouse is a decorative structure or object, often miniature or stylized, designed to aesthetically evoke the form and symbolism of a real lighthouse without serving a functional navigational purpose.
  • C. lighthouse maintenance program
    A lighthouse maintenance program is a coordinated set of procedures, schedules, and resources dedicated to ensuring lighthouses remain structurally sound, operationally reliable, and compliant with safety and navigational standards.
  • D. screw-pile lighthouse
    A screw-pile lighthouse is a type of lighthouse built on piles with helical screw bases that are screwed into the seabed, providing a stable foundation in soft or sandy bottoms, typically in shallow coastal waters.
  • E. lighthouse complex
    A lighthouse complex is a coastal facility comprising the lighthouse tower and its associated buildings, equipment, and infrastructure that together support the operation, maintenance, and habitation required for safe maritime navigation.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eeeb5138ac8190b3c273ddc659a54f completed April 27, 2026, 4:51 a.m.
Created at: April 27, 2026, 6:46 a.m.