Triple

T26967926
Position Surface form Disambiguated ID Type / Status
Subject Ascenso MX Clausura 2017 E679223 entity
Predicate instanceOf P0 FINISHED
Object Ascenso MX season C52308 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: Ascenso MX season
Context triple: [Ascenso MX Clausura 2017, instanceOf, Ascenso MX season]
  • A. phase of Liga MX
    A phase of Liga MX represents a distinct, time-bounded segment of the competition (such as regular season, playoffs, or finals) characterized by specific rules, format, and progression criteria for participating teams.
  • B. Campeones Cup
    The Campeones Cup is an annual soccer match between the reigning champions of Major League Soccer and Mexico’s Liga MX to crown a champion between the two leagues.
  • C. Major League Soccer season
    A Major League Soccer season is the annual competition cycle in which MLS clubs play a structured schedule of matches culminating in playoffs and a championship to determine the league winner.
  • D. MLS Cup final
    The MLS Cup final is the championship match of Major League Soccer that determines the league’s season champion.
  • E. CAF Confederation Cup season
    A CAF Confederation Cup season is the annual cycle of the Confederation of African Football’s secondary club competition, encompassing all qualifying rounds, group stages, and knockout matches leading to the crowning of the continental champion.
  • F. None of above. chosen

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eeeb4f3a448190b1e94b2d4776c16e completed April 27, 2026, 4:51 a.m.
Created at: April 27, 2026, 6:37 a.m.