Triple

T26956664
Position Surface form Disambiguated ID Type / Status
Subject Hopewell Furnace National Historic Site E678923 entity
Predicate periodOfOperationAsIronWorks P802 FINISHED
Object late 18th century to late 19th century LITERAL FINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: late 18th century to late 19th century | Statement: [Hopewell Furnace National Historic Site, periodOfOperationAsIronWorks, late 18th century to late 19th century]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: periodOfOperationAsIronWorks
Context triple: [Hopewell Furnace National Historic Site, periodOfOperationAsIronWorks, late 18th century to late 19th century]
  • A. operatedAsIronworksUntil
    Indicates that an entity functioned in the capacity of an ironworks up to a specified point in time.
  • B. historicalPeriodOfIndustrialUse
    Indicates the historical time span during which an entity was used for industrial purposes.
  • C. operatedSince
    Indicates that an entity has been in operation continuously from a specified starting time or date.
  • D. historicallyOperatedIn
    Indicates that an entity carried out its activities or operations within a particular location or context during a past time period.
  • E. operatedDuring chosen
    Indicates that an action, process, or system was functioning or in operation throughout a specified time period or event.
  • F. None of above.

Provenance (3 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eeeb4e75f08190b14fc91ca4a91488 completed April 27, 2026, 4:51 a.m.
NER Named-entity recognition batch_69f6352fdb788190b9bad30243690743 completed May 2, 2026, 5:32 p.m.
PD Predicate disambiguation batch_69f631850ae08190a0ba51e4f1e4ccb3 completed May 2, 2026, 5:16 p.m.
Created at: April 27, 2026, 6:27 a.m.