Triple

T26930274
Position Surface form Disambiguated ID Type / Status
Subject Grand Galaxy Park E678193 entity
Predicate instanceOf P0 FINISHED
Object lifestyle mall C727 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: lifestyle mall
Context triple: [Grand Galaxy Park, instanceOf, lifestyle mall]
  • A. shopping mall
    A shopping mall is a large, often enclosed commercial complex that houses multiple retail stores, dining options, and services connected by shared walkways and common areas.
  • B. mixed-use lifestyle center chosen
    A mixed-use lifestyle center is a planned development that combines retail, dining, entertainment, residential, and often office spaces in a walkable, open-air environment designed to create a vibrant, community-oriented destination.
  • C. shopping mall portfolio
    A shopping mall portfolio is a curated collection of multiple retail properties, typically managed or owned together, to optimize investment performance, tenant mix, and consumer reach across different locations.
  • D. shopping centre
    A shopping centre is a large complex of retail stores, services, and often entertainment facilities planned and managed as a single commercial property.
  • E. campus mall
    A campus mall is a central, often pedestrian-oriented outdoor or semi-outdoor space on a college or university campus that serves as a primary thoroughfare and social gathering area, typically lined with academic buildings, services, and green spaces.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eeeb4cac908190a45956c2993d1cc2 completed April 27, 2026, 4:51 a.m.
Created at: April 27, 2026, 6:12 a.m.