Triple

T26921498
Position Surface form Disambiguated ID Type / Status
Subject Kap Shui Mun Bridge E677658 entity
Predicate instanceOf P0 FINISHED
Object bridge in Hong Kong C4842 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: bridge in Hong Kong
Context triple: [Kap Shui Mun Bridge, instanceOf, bridge in Hong Kong]
  • A. bridge in London
    A bridge in London is a structural crossing over the River Thames or other waterways in the city, designed to support vehicular, rail, or pedestrian traffic while integrating with the historic and urban landscape.
  • B. cross-sea bridge chosen
    A cross-sea bridge is a large-scale transportation structure that spans a body of sea water to connect two land areas, enabling the passage of vehicles, trains, or pedestrians across marine environments.
  • C. 교량
    교량은 도로나 철도, 보행로 등이 강, 계곡, 도로 등 장애물을 안전하고 효율적으로 횡단할 수 있도록 상부구조와 하부구조로 이루어진 구조물이다.
  • D. bridge in Taiwan
    A bridge in Taiwan is a structural construction that spans physical obstacles such as rivers, valleys, or roads within Taiwan’s territory to provide transportation routes for vehicles, pedestrians, or railways.
  • E. bridge in Sydney
    A bridge in Sydney is a large engineered structure spanning a body of water or land to connect different parts of the city, facilitating transportation and often serving as a prominent architectural landmark.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eee9bdebc48190ba90a12a63e09c73 completed April 27, 2026, 4:44 a.m.
Created at: April 27, 2026, 6:07 a.m.