Triple
T26921498
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Kap Shui Mun Bridge |
E677658
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | bridge in Hong Kong |
C4842
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: bridge in Hong Kong Context triple: [Kap Shui Mun Bridge, instanceOf, bridge in Hong Kong]
-
A.
bridge in London
A bridge in London is a structural crossing over the River Thames or other waterways in the city, designed to support vehicular, rail, or pedestrian traffic while integrating with the historic and urban landscape.
-
B.
cross-sea bridge
chosen
A cross-sea bridge is a large-scale transportation structure that spans a body of sea water to connect two land areas, enabling the passage of vehicles, trains, or pedestrians across marine environments.
-
C.
교량
교량은 도로나 철도, 보행로 등이 강, 계곡, 도로 등 장애물을 안전하고 효율적으로 횡단할 수 있도록 상부구조와 하부구조로 이루어진 구조물이다.
-
D.
bridge in Taiwan
A bridge in Taiwan is a structural construction that spans physical obstacles such as rivers, valleys, or roads within Taiwan’s territory to provide transportation routes for vehicles, pedestrians, or railways.
-
E.
bridge in Sydney
A bridge in Sydney is a large engineered structure spanning a body of water or land to connect different parts of the city, facilitating transportation and often serving as a prominent architectural landmark.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eee9bdebc48190ba90a12a63e09c73 |
completed | April 27, 2026, 4:44 a.m. |
Created at: April 27, 2026, 6:07 a.m.