Triple

T26914677
Position Surface form Disambiguated ID Type / Status
Subject Great Gate E677485 entity
Predicate instanceOf P0 FINISHED
Object entrance tower C5026 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: entrance tower
Context triple: [Great Gate, instanceOf, entrance tower]
  • A. entrance building
    An entrance building is a structure that serves as the primary access point to a site or complex, often housing reception, security, and transitional spaces for visitors.
  • B. rock tower
    A rock tower is a vertically stacked arrangement of rocks or stones, often created intentionally for artistic, spiritual, or navigational purposes.
  • C. fortified tower chosen
    A fortified tower is a tall, strongly built defensive structure designed to provide elevated surveillance, protection, and control over the surrounding area.
  • D. entrance gate
    An entrance gate is a physical structure that marks and controls access to a property or area, often providing security, privacy, and a defined point of entry.
  • E. entrance
    An entrance is a designated point of access that allows people or objects to move from the outside into a defined space or area.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eee9bcef1c8190be88586bb902bb9b completed April 27, 2026, 4:44 a.m.
Created at: April 27, 2026, 6:03 a.m.