Triple
T26907637
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Bay Area Express Lanes |
E677297
|
entity |
| Predicate | trafficManagementRole |
P25845
|
FINISHED |
| Object | divert demand from general-purpose lanes |
—
|
LITERAL FINISHED |
How this triple was built (2 steps)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
NER
Named-entity recognition
gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: divert demand from general-purpose lanes | Statement: [Bay Area Express Lanes, trafficManagementRole, divert demand from general-purpose lanes]
PD
Predicate disambiguation
gpt-5-mini-2025-08-07
Target predicate: trafficManagementRole Context triple: [Bay Area Express Lanes, trafficManagementRole, divert demand from general-purpose lanes]
-
A.
trafficManagementStrategy
Indicates a method or plan used to control, organize, or optimize the flow of traffic within a transportation system.
-
B.
trafficManagementGoal
Indicates a goal or objective related to managing, regulating, or optimizing traffic flow and conditions.
-
C.
regulatesTrafficBetween
Indicates that one entity controls, manages, or directs the flow of traffic occurring between two other entities or locations.
-
D.
hasTrafficManagement
Indicates that an entity implements, uses, or is associated with systems or measures for controlling and optimizing traffic flow.
-
E.
roadSystemRole
chosen
Indicates the specific functional role or responsibility an entity has within a road or transportation network system.
- F. None of above.
Provenance (3 batches)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eee9bcef1c8190be88586bb902bb9b |
completed | April 27, 2026, 4:44 a.m. |
| NER | Named-entity recognition | batch_69f61fd723e08190b08f9f241d8afa7f |
completed | May 2, 2026, 4:01 p.m. |
| PD | Predicate disambiguation | batch_69f611af72ac819094598dd2530d7411 |
completed | May 2, 2026, 3:01 p.m. |
Created at: April 27, 2026, 6 a.m.