Triple
T26904438
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | MBTA maps |
E677215
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | transit map |
C52194
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: transit map Context triple: [MBTA maps, instanceOf, transit map]
-
A.
public transit plan
A public transit plan is a structured strategy that outlines routes, schedules, resources, and policies to provide efficient, accessible, and sustainable transportation services within a community or region.
-
B.
public transit system
A public transit system is an organized network of shared transportation services—such as buses, trains, subways, and trams—designed to move large numbers of people efficiently within and between urban and regional areas.
-
C.
public transit station
A public transit station is a designated facility where passengers can access, board, transfer between, and disembark from public transportation services such as buses, trains, or subways.
-
D.
road map
A road map is a visual representation of geographic areas that highlights roads, routes, and key landmarks to help users navigate from one location to another.
-
E.
map
A map is a conceptual class that represents a collection of key-value pairs, enabling efficient storage, retrieval, and association of data elements by unique keys.
- F. None of above. chosen
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eee9bcef1c8190be88586bb902bb9b |
completed | April 27, 2026, 4:44 a.m. |
Created at: April 27, 2026, 5:58 a.m.