Triple
T26886851
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Regional Transportation Master Plan of Waterloo Region |
E677063
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | transportation master plan |
C10251
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: transportation master plan Context triple: [Regional Transportation Master Plan of Waterloo Region, instanceOf, transportation master plan]
-
A.
metropolitan transportation planning instrument
A metropolitan transportation planning instrument is a formal tool or framework used to analyze, coordinate, and guide long-term transportation investments and policies across an urbanized region.
-
B.
regional transport plan
chosen
A regional transport plan is a strategic framework that outlines long-term goals, policies, and coordinated investments for transportation systems across a defined geographic region.
-
C.
urban planning master plan
An urban planning master plan is a comprehensive, long-term framework that guides the physical, social, and economic development of a city or region through coordinated land use, infrastructure, and policy strategies.
-
D.
short-range transportation plan
A short-range transportation plan is a detailed, near-term (typically 1–5 years) strategy outlining specific projects, investments, and operational changes to improve a transportation system’s performance and meet immediate mobility needs.
-
E.
public transit plan
A public transit plan is a structured strategy that outlines routes, schedules, resources, and policies to provide efficient, accessible, and sustainable transportation services within a community or region.
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eee9bc0c90819085608c8bdc513a57 |
completed | April 27, 2026, 4:44 a.m. |
Created at: April 27, 2026, 5:42 a.m.