Triple
T26881456
| Position | Surface form | Disambiguated ID | Type / Status |
|---|---|---|---|
| Subject | Seishin-Yamate Line |
E676908
|
entity |
| Predicate | instanceOf |
P0
|
FINISHED |
| Object | Kobe Municipal Subway line |
C36094
|
CONCEPT FINISHED |
How this triple was built (1 step)
Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.
CD
Concept disambiguation
gpt-5-mini-2025-08-07
Target class: Kobe Municipal Subway line Context triple: [Seishin-Yamate Line, instanceOf, Kobe Municipal Subway line]
-
A.
JR Kyushu line
The JR Kyushu line is a network of railway lines operated by Kyushu Railway Company (JR Kyushu) that provides passenger rail services across Japan’s Kyushu region.
-
B.
Hankyu Railway station
A Hankyu Railway station is a passenger rail facility operated by Hankyu Corporation in Japan, providing access to Hankyu’s private railway network through platforms, ticketing services, and related amenities.
-
C.
Tobu Railway station
A Tobu Railway station is a passenger rail facility operated by the private Japanese company Tobu Railway, serving as a stop for its regional and commuter train services.
-
D.
Osaka Metro facility
An Osaka Metro facility is any physical structure, station, depot, or related infrastructure owned or operated by Osaka Metro that supports the operation, maintenance, or use of its urban rail transit system.
-
E.
日本の都市鉄道路線
chosen
日本の都市鉄道路線は、日本国内の都市圏において通勤・通学や都市間移動を主目的として運行される鉄道・地下鉄・新交通システムなどの軌道路線の総称である。
- F. None of above.
Provenance (1 batch)
The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.
| Step | Stage | Batch ID | Status | When |
|---|---|---|---|---|
| creating | Elicitation | batch_69eee9bb44988190b6e11652d028bc59 |
completed | April 27, 2026, 4:44 a.m. |
Created at: April 27, 2026, 5:39 a.m.