Triple

T26876980
Position Surface form Disambiguated ID Type / Status
Subject Shuto Expressway Inner Circular Route E676778 entity
Predicate instanceOf P0 FINISHED
Object expressway loop C23017 CONCEPT FINISHED

How this triple was built (1 step)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

CD Concept disambiguation gpt-5-mini-2025-08-07
Target class: expressway loop
Context triple: [Shuto Expressway Inner Circular Route, instanceOf, expressway loop]
  • A. highway loop chosen
    A highway loop is a circular or semi-circular roadway segment that connects different parts of a highway system, allowing vehicles to change direction or access intersecting routes without stopping.
  • B. Interstate business loop
    An Interstate business loop is a special route that departs from an Interstate Highway to pass through the downtown or commercial center of a nearby city before reconnecting with the same Interstate.
  • C. elevated expressway
    An elevated expressway is a high-capacity roadway built on raised structures above ground level to allow uninterrupted traffic flow over urban streets, railways, or other obstacles.
  • D. motorway
    A motorway is a high-capacity, multi-lane road designed for fast, long-distance vehicular travel with controlled access and no at-grade intersections.
  • E. highway
    A highway is a major public road designed for high-speed, long-distance vehicular travel, typically featuring multiple lanes, limited access points, and safety infrastructure.
  • F. None of above.

Provenance (1 batch)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eee9bb44988190b6e11652d028bc59 completed April 27, 2026, 4:44 a.m.
Created at: April 27, 2026, 5:36 a.m.