Triple

T26858894
Position Surface form Disambiguated ID Type / Status
Subject Suri dynasty E676271 entity
Predicate majorInfrastructureProject P181398 FINISHED
Object Grand Trunk Road NE NERFINISHED

How this triple was built (2 steps)

Every LLM step that produced this triple, in pipeline order — named-entity classification, the disambiguation choices (the exact options shown, with the pick highlighted), and the generated description. The batch + timestamp of each is in the Provenance table below.

NER Named-entity recognition gpt-5-mini
Instruction
Given a phrase, classify it is english named entity (e.g., persons, organizations, works of art) in Latin script, or not (e.g., literals, dates, URLs, verbose phrases). For disambiguation, the statement where the phrase occurs as object is also given. Please return a JSON object with `phrase` (string, the phrase being analyzed) and `is_ne` (boolean, indicating whether the phrase is a Named Entity).
Input
Phrase: Grand Trunk Road | Statement: [Suri dynasty, majorInfrastructureProject, Grand Trunk Road]
PD Predicate disambiguation gpt-5-mini-2025-08-07
Target predicate: majorInfrastructureProject
Context triple: [Suri dynasty, majorInfrastructureProject, Grand Trunk Road]
  • A. infrastructureProjects
    Indicates that there are planned, ongoing, or completed construction or development works related to physical or organizational infrastructure involving the associated entities.
  • B. majorConstruction
    Indicates a relationship where a construction project is large-scale, significant, or of primary importance in scope, impact, or resources.
  • C. majorConstructionUnder
    Indicates that a location or structure is currently undergoing significant construction work or large-scale building activity.
  • D. includesMajorInfrastructure
    Indicates that the subject area or entity contains significant, large-scale infrastructure elements essential for core operations or services.
  • E. isMajorInfrastructure
    Indicates that the entity functions as a primary, large-scale facility or system essential to the operation of a region’s or organization’s core services or networks.
  • F. None of above. chosen

Provenance (4 batches)

The batch behind each pipeline step, in order, with when it ran. Timestamps are batch-level — stages were processed in waves, so the object chain (NER → NED1 → NEDg → NED2) reads in order, but predicate / elicitation batches can sit in a different wave.

Step Stage Batch ID Status When
creating Elicitation batch_69eee9b9d7708190a15d7485709ae981 completed April 27, 2026, 4:44 a.m.
NER Named-entity recognition batch_69f7764ab1fc81909f9348db87bd7692 completed May 3, 2026, 4:22 p.m.
PD Predicate disambiguation batch_69f76905d9c88190b1ee810bc9ab644f completed May 3, 2026, 3:25 p.m.
PDg Predicate description generation batch_69f77648979c8190b6cdbb835ab8987c completed May 3, 2026, 4:22 p.m.
Created at: April 27, 2026, 5:23 a.m.